Karya Bumi Baratama located in Muara Indung, Tanjung Rambai, Meruap, Ladang Panjang, Lubuk Sepuh Sarolangun District, Jambi Province and Musirawas District, South Sumatera Province and the mine area can be reached by four wheels drive through the country roads.
Mining location of PT. Karya Bumi Baratama far from human habitation around so much easier in terms of land acquisition and the location is very strategic for the development of 'Mine Mouth'
The electrical power support in mining sites is still less so it has possibility for PT KBB to build Steam Power in the ‘Mine Mouth’ of the mining sites.
The feasibility studies are includes geological and geotechnical studies, coal quality analysis and processing, hydrology and geohydrology, mine plan, transportation, environmental impact, community development, organization and man power as well as marketing and the economic feasibility of the mine operation.
For the mine area of PT KBB, the amount of coal which could be mined is estimated to reach 232.750 million metric tons.
In March 2007, PT KBB has changed from Domestic to Foreign Investment as stated in the amendment of a contract signed by the Minister of Energy and Mineral Resources, Purnomo Yusgiantoro in front of The President of Indonesia, Susilo Bambang Yudhoyono precisely on March 21, 2007.
At this point in the construction phase to PKP2B Sarolangun District, Jambi Province, covering 16.730 Ha, and for Musi Rawas District, South Sumatera, covering 1.710 Ha a still in the feasibility study stage. (Source)
There are three conditions, local and global situations that must be considered in determining the vision and mission of the company, among others:
UOB Plaza 38th Floor
Jl. M.H. Thamrin Kav. 8-10
Jakarta 10230 – Indonesia
E-mail: corp.secretary@hotmail.com
Telephone: (021) 23568677
Fax: (021) 23568655
Mine Surveyor Staff
Land Acquisitions Supervisor
Executive Director
HR/GA Manager
Business Development Manager
Finance Manager
recruitment@kbb.co.id
Mining location of PT. Karya Bumi Baratama far from human habitation around so much easier in terms of land acquisition and the location is very strategic for the development of 'Mine Mouth'
The electrical power support in mining sites is still less so it has possibility for PT KBB to build Steam Power in the ‘Mine Mouth’ of the mining sites.
The feasibility studies are includes geological and geotechnical studies, coal quality analysis and processing, hydrology and geohydrology, mine plan, transportation, environmental impact, community development, organization and man power as well as marketing and the economic feasibility of the mine operation.
For the mine area of PT KBB, the amount of coal which could be mined is estimated to reach 232.750 million metric tons.
In March 2007, PT KBB has changed from Domestic to Foreign Investment as stated in the amendment of a contract signed by the Minister of Energy and Mineral Resources, Purnomo Yusgiantoro in front of The President of Indonesia, Susilo Bambang Yudhoyono precisely on March 21, 2007.
At this point in the construction phase to PKP2B Sarolangun District, Jambi Province, covering 16.730 Ha, and for Musi Rawas District, South Sumatera, covering 1.710 Ha a still in the feasibility study stage. (Source)
There are three conditions, local and global situations that must be considered in determining the vision and mission of the company, among others:
- spirit of regional autonomy
- safety area
- Challenges of Globalization
“The realization of mining company which is professional, innovative, creative and environmentally sound manner with emphasis on safety, health and obedient in carrying out legislation and government regulations”
Logo
Contact
Jakarta Head Office:UOB Plaza 38th Floor
Jl. M.H. Thamrin Kav. 8-10
Jakarta 10230 – Indonesia
E-mail: corp.secretary@hotmail.com
Telephone: (021) 23568677
Fax: (021) 23568655
Jobs and Career
Mine Engineer StaffMine Surveyor Staff
Land Acquisitions Supervisor
Executive Director
HR/GA Manager
Business Development Manager
Finance Manager
How to Apply
If you meet the requirement in listed above please submit your Application and CV not later than April 27, 2012 to our email address that provided belowrecruitment@kbb.co.id









0 comments:
Post a Comment