PT Kereta Api Indonesia Persero is the major operator of public railways in Indonesia. It is completely owned by the government and pays track access charges to the government. One of its subsidiaries, PT KAI Commuter Jabodetabek, is operating electrified commuter service in Jakarta metropolitan area from August 14, 2008.
The total number of trackage laid in Indonesia was 7583 km, although not all lines were in operation at the same time. In 1939, the total operational trackage was 4588 km (It is unclear whether dual gauge tracks were counted once or twice). The present extent of the railways is now 5042 km, with the Aceh system, most of the West Sumatra system and most former steam tram lines disused, but including new tracks built alongside old tracks (double tracking projects).
Much of the branch lines constructed in the colonial era has been lifted up or abandoned in the 1980s. No major railway construction has since taken place, however, many of the busiest lines have been double tracked, and this is still ongoing. The northern coast area of Java double-track would be completed in 2013 and then the government will finish a 1,000-kilometer double-track on the south coast of Java by 2015 (Source)
Head Office:
PT. Kereta Api Indonesia (Persero)
Jalan Perintis Kemerdekaan No. 1 Bandung 40117
Phone: (022) 4230031, 4230039, 4230054
Telex : 28263, 28358
Fax: (022) 4203342, Toka 10039
Box Pos : PO Box 1163 Bandung 40000
Website : www.kereta-api.co.id
Email : kontak_pelanggan@kereta-api.co.id
Rekrutment External S1/S2 Accounting 2012
Rekrutment Masinis & PPKA Tingkat SMU Kereta Api Indonesia 2012
The total number of trackage laid in Indonesia was 7583 km, although not all lines were in operation at the same time. In 1939, the total operational trackage was 4588 km (It is unclear whether dual gauge tracks were counted once or twice). The present extent of the railways is now 5042 km, with the Aceh system, most of the West Sumatra system and most former steam tram lines disused, but including new tracks built alongside old tracks (double tracking projects).
Much of the branch lines constructed in the colonial era has been lifted up or abandoned in the 1980s. No major railway construction has since taken place, however, many of the busiest lines have been double tracked, and this is still ongoing. The northern coast area of Java double-track would be completed in 2013 and then the government will finish a 1,000-kilometer double-track on the south coast of Java by 2015 (Source)
Logo
Contact
Head Office:
PT. Kereta Api Indonesia (Persero)
Jalan Perintis Kemerdekaan No. 1 Bandung 40117
Phone: (022) 4230031, 4230039, 4230054
Telex : 28263, 28358
Fax: (022) 4203342, Toka 10039
Box Pos : PO Box 1163 Bandung 40000
Website : www.kereta-api.co.id
Email : kontak_pelanggan@kereta-api.co.id
Rekrut Kereta Api Indonesia
Rekrutment External S1/S2 Accounting 2012
Rekrutment Masinis & PPKA Tingkat SMU Kereta Api Indonesia 2012









0 comments:
Post a Comment